Eco Lodge Conference Centre - Goedgedacht Trust

3.8/5 rating (5 votes)
  • Last update: 22 March 2013
  • File size: 168.98 KB
  • Downloaded: 1150

Hilton Johnson, the Operations and Maintenance manager at the Goedgedacht Trust Conference Centre, talks to us about working with their biogas digester.

“The catering staff have so much gas they do not need to buy in LP Gas” he says “Feeding the digester is no more work than emptying the garbage was previously”